Ansonia-Derby Regional School Study

Old classroom in a museum

 

Ansonia-Derby School Regionalization Study

In May 2018, The Connecticut General Assembly approved Public Act 18-169, which appropriated funding for a school consolidation study for the Cities of Ansonia and Derby. In accordance with Connecticut State Statutes §10-39 through §10-43, the cities’ Boards of Aldermen subsequently appointed members of the Temporary Regional School Study Committee (TRSSC).

NVCOG’s function in the study was to serve as fiduciary and contracting authority. Following a Qualification Based Selection process for a study consultant, District Management Group, of Boston, MA, was selected as consultant.

The study analyzed a number of areas regarding the advisability of combining school districts. It also analyzed potential cost savings or operational efficiencies resulting from shared services in separate school districts. The TRSSC expired according to state statute in February 2022 and members chose not to issue a recommendation. 

Consultant Documents:

Staff Contact:

Rick Dunne
Executive Director
rdunne@nvcogct.gov

Share this page

Derby O’Sullivan’s Island

Derby O'Sullian Island

Project Type: DECD funded – Environmental Sampling and U.S. Fish and Wildlife funded – Engineering/Construction

Activities:

Environmental Assessment Activities include Phase I and Phase II Environmental Assessment Activities while U.S. Fish and Wildlife funded activities includes the Design, Engineering, and Construction of a Fishing and Viewing Platform

O’Sullivan’s Island is a peninsula at the confluence of the Housatonic and Naugatuck Rivers, located south of Derby’s downtown commercial district. While vehicles and trains pass nearby, the site offers a welcome moment of quiet among trees along the waterfront. Enveloped by structure, water, and sky, O’Sullivan’s Island is one of the most interesting and naturally beautiful pieces of land in the lower Naugatuck Valley. It is also one of the most challenging brownfield locations NVCOG has had the opportunity to improve.

Over the last decade, NVCOG’s Environmental Planner Arthur Bogen, Ricardo Rodriguez and Executive Director Rick Dunne have been significant players in the orchestration of funding contributions and work completed by the City of Derby and the Connecticut Department of Economic and Community Development. O’Sullivan’s Island Recreation Park opened to the public for the first time in over twenty years in 2009. In 2013 the City of Derby completed its portion of the Naugatuck River Greenway trail that runs across the site’s northern edge.

NVCOG was awarded a $200,000 DECD grant to conduct environmental assessments and develop (if needed) remediation strategies on the site. The U.S. Fish and Wildlife Service (USFWS) on behalf of the Connecticut Housatonic Natural Resource Trustee Council awarded NVCOG $325,000 to construct an accessible fishing and viewing platform at O’Sullivan’s Island Recreation Park.

Project Status:  DECD – Phase I and Phase II Environmental Site Assessment complete. The handicapped-accessible fishing and viewing platform is now open to the public. 

Main Street South, Derby

 

Project Type: Assessment

Activities: Environmental Site Assessments on 4 parcels: 

  • 2 Factory Street
  • 23 Factory Street
  • 90 Main Street
  • 0 Water Street

The City of Derby received multiple inquiries from private parties regarding city-owned parcels south of Main Street. These parcels have long been part of Derby’s central design district and are approved for high-density, mixed-use development. The City requested NVCOG apply on its behalf for funding through the Connecticut Department of Economic and Community Development’s (CT DECD) Municipal Grant Program.

NVCOG was awarded $200,000 to conduct assessment activities in the Derby Main Street South project area. Environmental assessment activities will support the construction of local roads in the area and will target parcels most ready for development. The assessment project is critical to the success of the City of Derby’s $5 million Urban Act grant, which will directly fund construction of local roads and infrastructure. 

Project Status: A Request for Proposals (RFP) for a Licensed Environmental Professional (LEP) for assessment services was sent to NVCOG’s  pre-qualified short list. Five proposals received. The RBP Project Selection Committee invited Arcadis to enter contract negotiations.

 To date, Arcadis has produced:

  • 2 Factory Street – Phase I, Phase II, and Hazardous Building Material Survey
  • 23 Factory Street – Phase I, Phase II, and Hazardous Building Material Survey
  • 90 Main Street – Phase I and Hazardous Building Material Survey
  • 0 Water Street – Phase I

Documents: Derby Main Street South Request for Proposals

Route 8 & Waterbury Branch Line Corridor/Alternative Modes Study

The Route 8 & Waterbury Branch Line Corridor/Alternative Modes Study has concluded, evaluating the requirements and prospects for enhancing services on the Waterbury Branch Line. It has also examined the viability of alternatives to single-occupancy vehicles, offering insights into options for alleviating congestion and enhancing mobility across Route 8 and Waterbury Branch Line corridors.