An opportunity to turn data and public input into a 25-year vision for transportation in the NVCOG Region.
Showing results for vicechair online pharmacy vgr www vicechair online vicechair price order vicechair vicechair
NVision 2022
Woodbury – Route 6 Corridor Study
The NVCOG, in collaboration with the CTDOT, the Town of Woodbury, and the Federal Highway Administration, is preparing to engage a multi-disciplinary team to complete a corridor study along US Route 6 through Woodbury. The intent of the study is to address safety and traffic flow concerns and provide for improved pedestrian, bicycle, and transit-user accessibility.
909 Bank Street, Waterbury
1 Main Street, Berlin
Naugatuck 251 Rubber Ave
Berlin 161 Massirio Drive
Berlin 1406 Chamberlain Highway
Derby-Shelton Bridge Pedestrian and Bicyclist Enhancements
Route 8 & Waterbury Branch Line Corridor/Alternative Modes Study
The Route 8 & Waterbury Branch Line Corridor/Alternative Modes Study has concluded, evaluating the requirements and prospects for enhancing services on the Waterbury Branch Line. It has also examined the viability of alternatives to single-occupancy vehicles, offering insights into options for alleviating congestion and enhancing mobility across Route 8 and Waterbury Branch Line corridors.