The Naugatuck Valley Active Transportation Plan (NVATP) will aim to coordinate efforts across our 19 municipal members. By compiling best practices and standards, NVCOG aims to encourage increased access to safe, convenient walking/rolling and biking facilities.
Showing results for cuti online pharmacy www cuales online cials cost casada cials cost casada chemist warehouse online cuti online pharmacy www cuales online cials cost casada 20- casada 20
Interstate 84/ Route 8 New Mix
Regional Housing Profile
VMT Reduction Strategy
SGA Complete Streets Academy
300 Broad Street, Bristol
Metropolitan Transportation Plan
Ansonia-Derby Regional School Study
NRG Thomaston – Watertown Design & Construction
The Towns of Thomaston and Watertown received a federal Recreational Trails Program grant through the CT Department of Energy and Environmental Protection to design and construct a trailhead parking area and short section of Naugatuck River Greenway (NRG) trail in Thomaston and to design critical features along the future NRG route in Watertown.
Woodbury – Route 6 Corridor Study
The NVCOG, in collaboration with the CTDOT, the Town of Woodbury, and the Federal Highway Administration, is preparing to engage a multi-disciplinary team to complete a corridor study along US Route 6 through Woodbury. The intent of the study is to address safety and traffic flow concerns and provide for improved pedestrian, bicycle, and transit-user accessibility.
Route 8 & Waterbury Branch Line Corridor/Alternative Modes Study
The Route 8 & Waterbury Branch Line Corridor/Alternative Modes Study has concluded, evaluating the requirements and prospects for enhancing services on the Waterbury Branch Line. It has also examined the viability of alternatives to single-occupancy vehicles, offering insights into options for alleviating congestion and enhancing mobility across Route 8 and Waterbury Branch Line corridors.