This meeting will be held in a workshop/charrette style format. The findings of the existing conditions analysis will be reviewed and our team will facilitate a workshop to brainstorm potential…
Showing results for canadian online pharmacy cts www coates online much ctica cost costs canada coates
Hazard Mitigation Plan Public Workshop – Hazard Risk Reduction Strategies
Area residents will have the opportunity to provide input on regional plans to address natural hazard events during a virtual workshop on Wednesday, February 10, 2021 at 6 p.m. Recent…
Public Information Meeting for State Project No. 124-165 in Seymour
The Naugatuck Valley Council of Governments (NVCOG) held a virtual public information meeting to present preliminary design plans on Spot Improvements to Route 67 (Bank Street), in the Town of Seymour. The public…
Public Information Meeting for the Derby-Shelton Bridge Project
PUBLIC NOTICE Everyone Is Invited To A PUBLIC INFORMATION MEETING State Project No. 126-174 TO BE HELD: Wednesday, February 26, 2020, at the Shelton City Hall, 54 Hill Street, Shelton,…
FISH with CARE Event – Derby, CT
SGA Complete Streets Academy
300 Broad Street, Bristol
SMM Trash Reduction Pilot Program
Metropolitan Transportation Plan
Ansonia-Derby Regional School Study
NRG Thomaston – Watertown Design & Construction
The Towns of Thomaston and Watertown received a federal Recreational Trails Program grant through the CT Department of Energy and Environmental Protection to design and construct a trailhead parking area and short section of Naugatuck River Greenway (NRG) trail in Thomaston and to design critical features along the future NRG route in Watertown.
Route 8 & Waterbury Branch Line Corridor/Alternative Modes Study
The Route 8 & Waterbury Branch Line Corridor/Alternative Modes Study has concluded, evaluating the requirements and prospects for enhancing services on the Waterbury Branch Line. It has also examined the viability of alternatives to single-occupancy vehicles, offering insights into options for alleviating congestion and enhancing mobility across Route 8 and Waterbury Branch Line corridors.