Woodbury – Route 6 Corridor Study

[…] a corridor study along US Route 6 through Woodbury. The intent of the study is to address safety and traffic flow concerns and provide for improved pedestrian, bicycle, and transit-user accessibility.

Metropolitan Transportation Plan

I-84 in Waterbury

An opportunity to turn data and public input into a 25- year vision for transportation in the NVCOG Region.    Updating Our Plan The public outreach period for the Metropolitan Transportation […]

Waterbury Residential Street Traffic Calming Study

The NVCOG is developing a proposed comprehensive strategy for implementing residential street traffic calming interventions in the City of Waterbury. Through crafting a sample policy and guidebook, the NVCOG will […]

Traffic Congestion Memo: Route 63

  BEACON FALLS • BETHLEHEM • CHESHIRE • MIDDLEBURY • NAUGATUCK • OXFORD • PROSPECT • SOUTHBURY • THOMASTON • WATERBURY • WATERTOWN • WOLCOTT • WOODBURY      …

COGCNV Economic Development Strategic Plan 2000

Draft ReportMt. Auburn Associates, Inc. i E XECUTIVE S UMMARY The Central Naugatuck Valley region has slowly emerged from the adverse effects of the late 1980’s and early 1990’s recession….

Route 67 Preliminary Engineering Study

Copyright 2016 Milone & MacBroom, Inc. ROUTE 67 (BANK STREET) SPOT IMPROVEMENTS PRELIMINARY ENGINEERING REPORT SEYMOUR, CONNECTICUT State Project No. 124-165 MMI # 3211-02-4 February 1 9, 2014 (Revised March…

PM 2.5 Air Quality Conformity Determination September 2016

Table of Contents Connecticut Department of Transportation Council of Governments of the Central Naugatuck Valley Greater Bridgeport and Valley Metropolitan Planning Organization South Central Regional Council of Governments Western Connecticut…