Climate Pollution Reduction Grants (CPRG)

The Climate Pollution Reduction Grants (CPRG) are a five-billion-dollar federal program to help state and regional governments reduce greenhouse gases. NVCOG towns are split among several planning regions, each of which is conducting its own GHG assessment and planning GHG reduction measures.

Waterbury Line Station Projects

Through a series of state and federal funding sources, the CT Department of Transportation is undertaking a project to upgrade all six Waterbury Line train stations. These upgrades will not only provide a safer and more comfortable experience for passengers but allow the stations to serve as key places within their communities, a source of civic pride and a gathering place for residents and visitors. 

Route 8 Design/Build

The Route 8 Design Build project will bring the section of roadway from Exit 13 in Shelton to Exit 22 in Seymour up to modern highway standards and make it safer for motorists. The work is expected to start in the summer of 2023 and finish by the end of 2024.

Bus Shelter Replacement Project

The NVCOG and the Valley Transit District are working with a team to design and build bus shelters to address the current lack of accommodations. This project aims to improve public transit facilities in lower valley municipalities.

MTP 2050

NVision50: The Metropolitan Transportation Plan for the NVCOG and the Central Naugatuck Valley MPO lays out a comprehensive vision for transportation in our region leading up to 2050.

Regional Hazard Mitigation Plan Update

The final Regional Hazard Mitigation Plan and Municipal Annexes have been posted to the NVCOG Hazard Mitigation Plan webpageThe Plan has been adopted by all 19 NVCOG Communities, and the NVCOG Board endorsed the plan on December 10, 2021.  FEMA approved the plan in January, 2022.  

In 2019, NVCOG received funding from the Federal Emergency Management Agency (FEMA) to conduct a multi-jurisdictional Natural Hazard Mitigation Plan (NHMP) for all 19 NVCOG municipalities. 

An approved NHMP is required by FEMA to qualify a municipality for certain federal mitigation funding. NHMPs must be updated every 5 years. The purpose of this project is to update municipal NHMPs and develop a consolidated multijurisdictional plan for the entire Naugatuck Valley planning region in compliance with FEMA standards and requirements that will serve as the approved NHMP for each NVCOG municipality. 

Naugatuck River flooding in 1955

The NHMP will identify natural hazards and risks, existing capabilities, and activities that can be undertaken by a community to prevent loss of life and reduce property damages associated with the identified hazards. Public safety and property loss reduction are the driving forces behind this plan. Careful consideration will also be given to the preservation of history, culture and the natural environment of the region. 

Milone & MacBroom Inc. (MMI) was selected to serve as the project consultant. MMI has extensive experience developing NHMPs in the region and across the state.  NVCOG is administering the project and has prepared a detailed scope of work in collaboration with MMI. The project is expected to take 18 months and will include extensive public and stakeholder outreach and coordination with various municipal officials and departments.

Interactive Storymap:  

Click on the tabs at the top of the Project Storymap and scroll through the narrative to learn about hazards impacting the region and view topical maps.

Meetings and Workshops:

Public Information Meeting 8/4/2021
Recording
 
Public Workshop #2: Mitigation 
Recording
Slides
 
Coordinator Workshop #2: Mitigation
Recording
Slides
 
Public Workshop #1: Risk 
Slides
 
Coordinator Workshop #1: Risk
Recording 
Breakout Room Recording
Slides
 
Project Kickoff Meeting
Slides

Upcoming Meetings:

There are no upcoming events.

View Full Calendar

Staff Contact:  

Aaron Budris
Environmental Planning Director
abudris@nvcogct.gov

Route 8 & Waterbury Branch Line Corridor/Alternative Modes Study

The Route 8 & Waterbury Branch Line Corridor/Alternative Modes Study has concluded, evaluating the requirements and prospects for enhancing services on the Waterbury Branch Line. It has also examined the viability of alternatives to single-occupancy vehicles, offering insights into options for alleviating congestion and enhancing mobility across Route 8 and Waterbury Branch Line corridors.