Showing results for papel online pharmacy ppl www pole online payable buy powell

Active Transportation Plan

The Naugatuck Valley Active Transportation Plan (NVATP) will aim to coordinate efforts across our 19 municipal members. By compiling best practices and standards, NVCOG aims to encourage increased access to safe, convenient walking/rolling and biking facilities.

Interstate 84/ Route 8 New Mix

The Mixmaster The interchange of Interstate 84 and Connecticut Route 8, located just west of Downtown Waterbury, has long been called “the Mixmaster” because of the complex web of highways,…

Waterbury Residential Street Traffic Calming Study

The NVCOG is developing a proposed comprehensive strategy for implementing residential street traffic calming interventions in the City of Waterbury. Through crafting a sample policy and guidebook, the NVCOG will outline how the city may best address road safety concerns and respond to resident requests.

Woodbury – Route 6 Corridor Study

The NVCOG, in collaboration with the CTDOT, the Town of Woodbury, and the Federal Highway Administration, is preparing to engage a multi-disciplinary team to complete a corridor study along US Route 6 through Woodbury. The intent of the study is to address safety and traffic flow concerns and provide for improved pedestrian, bicycle, and transit-user accessibility.

Annual Report 2012

COGCNV  STAFF   Peter Dorpalen,  Executive Director  Samuel  Gold, Senior  Planner   Joe  Perrelli ,  Senior Planner    Pat  Gallagher,  Regional Planner   Glenda  Prentiss,  GIS Coordinator   Aaron  Budris,  Planning  Assistant,  GIS  Lauren  Rizzo, Administrative  Assistant  Patricia…

CNV Transportation Improvement Program (TIP) 2018-2021

1 Central Naugatuck Valley Metropolitan Planning Organization FFY 2018 – 2021 Transportation Improvement Program Prepared by: Naugatuck Valley Council of Governments in cooperation with the Connecticut Department of Transportation Endorsed:…