SGA Complete Streets Academy

Connecticut was selected to participate in Smart Growth America’s Complete Streets Academy with the cities of Bristol, Middletown, and Waterbury. 

The NVCOG and its partner communities, Waterbury and Bristol, participated in the 2023 Complete Streets Academy, enabling implementation of impactful traffic calming projects in the jurisdictions. The Complete Streets Leadership Academies are a National Complete Streets Coalition and Smart Growth America initiative training public employees and officials in Complete Street best practices, intergovernmental and regional coordination, and “quick-build” temporary infrastructure projects on state roads. 

Each city installed a temporary project to collect data and feedback about complete streets installations on key state owned routes near their respective Downtowns. This data will be used to inform future designs and improvements to these and similar streets to enhance safety, comfort, and pedestrian/bicycle access.

Bristol

Bristol implemented temporary pedestrian safety improvements on West Street, including narrowing the roadway and adding visual elements and improved crosswalks near the Boys & Girls Club of Bristol. The NVCOG staff joined Mayor Jeff Caggiano of Bristol and the Connecticut Department of Transportation’s Safe Routes to School office to engage Bristol youth and promote pedestrian safety.  

Waterbury

Waterbury’s project made Grand Street a more vibrant, pedestrian-friendly location leveraging low-cost materials like tape, cones, and tubular markers to daylight crosswalks and shorten their crossing distance. The project was in place through late September. Data showed an 11% reduction in traffic speeds within the first two weeks, a crucial step towards enhancing community safety as lowering speeds at the 85th percentile can significantly reduce traffic-related accidents.

Climate Pollution Reduction Grants (CPRG)

The Climate Pollution Reduction Grants (CPRG) are a five-billion-dollar federal program to help state and regional governments reduce greenhouse gases. NVCOG towns are split among several planning regions, each of which is conducting its own GHG assessment and planning GHG reduction measures.

300 Broad Street, Bristol

Project type: Assessment

Activities: The Regional Brownfield Partnership has awarded 300 Broad Street Properties LLC. $83,000 in petroleum assessment funds to conduct environmental assessment activities inside the combined 175,000 foot facility and surrounding footprint. The site was historically used for a variety of manufacturing and industrial purposes. The century-old manufacturing complex was constructed in 1915 by Wallace Barnes Company and last occupied by Theis Precision Steel until 2019. The now-vacant parcel was acquired by private developers in 2022. A conceptual RAP, supported by Phase II and Phase III reports valued expected remedial costs between $1 million and $3 million. Once complete, the property owners intend to rehabilitate existing interior space to modern manufacturing, industrial, and warehouse facilities. Invested funds are expected to leverage several million dollars in private funding and create dozens of full-time, high-paying jobs.  

Project Status: NVCOG has secured an award of $3.7 million from the Department and Economic and Community Development to abate and remediate four existing buildings on the 23-acre site. Preliminary meetings will take place throughout the summer with the property owners, DECD, and NVCOG staff. 

Bristol – Downtown Trail Routing Study

The NVCOG, in collaboration with the City of Bristol, conducted a Bristol Downtown Trail Routing Study to explore potential downtown routing options to provide a safe, continuous connection between Rockwell Park in the west to Downtown, continuing east to Route 229.

MTP 2050

NVision50: The Metropolitan Transportation Plan for the NVCOG and the Central Naugatuck Valley MPO lays out a comprehensive vision for transportation in our region leading up to 2050.

Regional Hazard Mitigation Plan Update

The final Regional Hazard Mitigation Plan and Municipal Annexes have been posted to the NVCOG Hazard Mitigation Plan webpageThe Plan has been adopted by all 19 NVCOG Communities, and the NVCOG Board endorsed the plan on December 10, 2021.  FEMA approved the plan in January, 2022.  

In 2019, NVCOG received funding from the Federal Emergency Management Agency (FEMA) to conduct a multi-jurisdictional Natural Hazard Mitigation Plan (NHMP) for all 19 NVCOG municipalities. 

An approved NHMP is required by FEMA to qualify a municipality for certain federal mitigation funding. NHMPs must be updated every 5 years. The purpose of this project is to update municipal NHMPs and develop a consolidated multijurisdictional plan for the entire Naugatuck Valley planning region in compliance with FEMA standards and requirements that will serve as the approved NHMP for each NVCOG municipality. 

Naugatuck River flooding in 1955

The NHMP will identify natural hazards and risks, existing capabilities, and activities that can be undertaken by a community to prevent loss of life and reduce property damages associated with the identified hazards. Public safety and property loss reduction are the driving forces behind this plan. Careful consideration will also be given to the preservation of history, culture and the natural environment of the region. 

Milone & MacBroom Inc. (MMI) was selected to serve as the project consultant. MMI has extensive experience developing NHMPs in the region and across the state.  NVCOG is administering the project and has prepared a detailed scope of work in collaboration with MMI. The project is expected to take 18 months and will include extensive public and stakeholder outreach and coordination with various municipal officials and departments.

Interactive Storymap:  

Click on the tabs at the top of the Project Storymap and scroll through the narrative to learn about hazards impacting the region and view topical maps.

Meetings and Workshops:

Public Information Meeting 8/4/2021
Recording
 
Public Workshop #2: Mitigation 
Recording
Slides
 
Coordinator Workshop #2: Mitigation
Recording
Slides
 
Public Workshop #1: Risk 
Slides
 
Coordinator Workshop #1: Risk
Recording 
Breakout Room Recording
Slides
 
Project Kickoff Meeting
Slides

Upcoming Meetings:

There are no upcoming events.

View Full Calendar

Staff Contact:  

Aaron Budris
Environmental Planning Director
abudris@nvcogct.gov

Route 229 Corridor Study

Final Public Meeting: May 26, 2022

The final public engagement meeting occurred on Thursday, May 26th, with both a virtual option and an in person meeting at the Bristol Public Library. The study team started by presenting recommendations for improvements along the corridor, followed by an opportunity for public comment on those changes. The meeting recording is available on the NVCOG YouTube page and is linked below. Comments will be accepted in writing to contactus@nvcogct.gov through June 27, 2022, and will be incorporated in the final report. 

Meeting Recording

Draft Final Report 

Second Public Meeting: September 29, 2021

A second public engagement session was held on Wednesday, September 29. It began with a guided tour of the corridor, including stops in both Bristol and Southington. More details of the locations visited are in the flyer below. This was followed by a public meeting at the Bristol Library. For those who were unable to attend the meeting there is a recording available on the NVCOG YouTube page that is linked below. Slides from this meeting have also been posted. 

Tour Flyer

See a recording of the meeting here: https://www.youtube.com/watch?v=77q3zOrCYm8

Slides for this meeting can be found here

First Public Meeting: April 14, 2021

The Route 229 project team held a virtual public meeting on April 14 between 5 – 7 pm. The goals and objectives of the Route 229 Corridor study were discussed and stakeholders had the opportunity to ask questions and offer public input on this project. 

See a Recording of the meeting here: https://youtu.be/2f0RTZFTNQo

Slides for this meeting are available here