The design of the project has been completed to improve Route 67 from the west end of the Klarides Village retail development extending easterly along Bank Street to the eastern side of the bridge over the Naugatuck River. The project will proceed to construction in the Spring of 2024.
Active Transportation Plan
Interstate 84/ Route 8 New Mix
Metro Hartford Region Bike Share Plan (Executive Summary)(includes Waterbury)
https://nvcogct.gov/wp–content/uploads/2014/07/Metro–Hartford–Bikeshare–Executive–Summary.pdf
Transportation Trends and Characteristics in the CNVR
https://nvcogct.gov/wp–content/uploads/2014/03/COGCNV–Transportation–Trends–Characteristics–2012.pdf
Animal Shelter Feasibility Study
https://nvcogct.gov/wp–content/uploads/2014/04/COGCNV–Regional–Animal–Shelter–Study–FINAL–2–14–2014.pdf
CNV Transportation Improvement Program (TIP) 2018–2021
https://nvcogct.gov/wp–content/uploads/2018/07/CNVR–TIP–Draft–compressed.pdf
Transit Oriented Development in the Lower Naugatuck Valley
Naugatuck River Greenway Routing Study: Executive Summary
Traffic Congestion Memo: Route 69 at Scott Road
COUNCIL OF GOVERNMENTS CENTRAL NAUGATUCK VALLEY 60 NORTH MAIN ST • 3RD Floor • WATERBURY, CT 06702 -1403 (203)757–0535 Web Site: www.cogcnv.org E–Mail: cogcnv@cogcnv.org BEACON FALLS BETHLEHEM CHESHIRE MIDDLEBURY NAUGATUCK OXFORD…
Unified Planning Work Program (UPWP) for the CNVR MPO FY 2016–2017
https://nvcogct.gov/wp–content/uploads/2015/07/CNVR–MPO–FY–2016–2017–UPWP.pdf
Traffic Congestion Memo: Route 63 and Route 64
https://nvcogct.gov/wp–content/uploads/2014/03/COGCNV–Congestion–Route–63–64–memo–2013.pdf