https://nvcogct.gov/wp–content/uploads/2014/03/COGCNV–Naugatuck–River–Greenway–Routing–Study–Executive–Summary.pdf
CNV Transportation Improvement Program (TIP) 2018–2021
https://nvcogct.gov/wp–content/uploads/2018/07/CNVR–TIP–Draft–compressed.pdf
Annual Report 2012
https://nvcogct.gov/wp–content/uploads/2016/01/COGCNV–Annual–Report–2012_0.pdf
Community Relations Plan (17–19 Henry Healey Drive, Ansonia)
https://nvcogct.gov/wp–content/uploads/2016/07/ANSO_17–19HenryHealeyDrive_ABCACRP_2016_07_08.pdf
Naugatuck Valley Regional Economic Profile 2014
I–84/Rt 8 Interchange Study – Technical Memo #1: Existing Conditions
Technical Memorandum #1 Fitzgerald & Halliday, Inc. URS Corporation AES Keville Enterprises, Inc. In association with: State Project 151 -301 Technical Memorandum #1 Fitzgerald & Halliday, Inc. URS Corporation AES Keville…
web map
A map that is not simply on the web, but rather one that is powered by the online GIS technologies.
Unified Planning Work Program (UPWP) for the CNVR MPO FY 2016–2017
https://nvcogct.gov/wp–content/uploads/2015/07/CNVR–MPO–FY–2016–2017–UPWP.pdf
Unified Planning Work Program (UPWP) for the Greater Bridgeport & Valley MPO – Valley Planning Region Portion FY 2016–2017
https://nvcogct.gov/wp–content/uploads/2015/07/VCOG–FY–2016–2017–UPWP.pdf