https://nvcogct.gov/wp–content/uploads/2016/07/ANSO_17–19HenryHealeyDrive_ABCACRP_2016_07_08.pdf
I–84/Rt 8 Interchange Study – Technical Memo #2: Alternatives
Technical Memorandum #2 State Project 151 -301 Fitzgerald & Halliday, Inc. URS Corporation AES Keville Enterprises, Inc. In association with: Technical Memorandum #2 Prepared for: State Project 151–301 Fitzgerald & […]
Ozone Air Quality Conformity Determination September 2016
https://nvcogct.gov/wp–content/uploads/2016/10/Ozone–AQ–Conformity–Determination–Report–September–2016.pdf
NVCOG Metropolitan Transportation Plan 2019–2045
https://nvcogct.gov/wp–content/uploads/2019/03/NVCOG–MTP–DRAFT1–w–Appendices–20190222.pdf
CNV Transportation Improvement Program (TIP) 2018–2021
1 Central Naugatuck Valley Metropolitan Plann ing Organization FFY 2018 – 2021 Transportation Improvement Program Prepared by: Naugatuck Valley Council of Governments in cooperation with the Connecticut Department of Transportation […]
Route 229 Corridor Study
PM 2.5 Air Quality Conformity Determination September 2016
https://nvcogct.gov/wp–content/uploads/2016/10/PM–2.5–AQ–Conformity–September–2016.pdf
CNVR Fiscal Impact Report 2000
Central Naugatuck Valley Region FISCAL IMPACT REGIONAL SUMMARY REPORT Council of Governments Central Naugatuck Valley The pictures on the cover were arranged in relation to each communities general location in…
Naugatuck Valley Regional Profile 2018
https://nvcogct.gov/wp–content/uploads/2019/04/Naugatuck–Valley–Regional–Profile–2018.pdf
Naugatuck Valley Regional Profile 2014
https://nvcogct.gov/wp–content/uploads/2014/10/Naugatuck–Valley–Regional–Profile–2014.pdf
Unified Planning Work Program (UPWP) for the CNVR MPO FY 2016–2017
https://nvcogct.gov/wp–content/uploads/2015/07/CNVR–MPO–FY–2016–2017–UPWP.pdf
Unified Planning Work Program (UPWP) for the Greater Bridgeport & Valley MPO – Valley Planning Region Portion FY 2016–2017
https://nvcogct.gov/wp–content/uploads/2015/07/VCOG–FY–2016–2017–UPWP.pdf