I-84/Rt 8 Interchange Study – Technical White Paper
Existing (2005) and future (2030) conditions within the study area were assessed by evaluating transportation, traffic operations, geometric and structural conditions, environmental constraints, pedestrian and bicyclist needs and safety.March 5, 2014
I-84/Rt 8 Interchange Study – Technical Memo #2: Alternatives
Existing (2005) and future (2030) conditions within the study area were assessed by evaluating transportation, traffic operations, geometric and structural conditions, environmental constraints, pedestrian and bicyclist needs and safety.March 5, 2014
I-84/Rt 8 Interchange Study – Technical Memo #1: Existing Conditions
Existing (2005) and future (2030) conditions within the study area were assessed by evaluating transportation, traffic operations, geometric and structural conditions, environmental constraints, pedestrian and bicyclist needs and safety.March 5, 2014
I-84/Rt 8 Interchange Study: Deficiencies and Needs Report
Existing (2005) and future (2030) conditions within the study area were assessed by evaluating transportation, traffic operations, geometric and structural conditions, environmental constraints, pedestrian and bicyclist needs and safety.March 5, 2014
Congestion Management System Report: 2008
The 2008 Congestion Management System Report (CMS) summarizes the results of COGCNV’s traffic congestion monitoring for 2007-2008.March 5, 2014
Transportation Trends and Characteristics in the CNVR
This report presents transportation statistics from the 2006-2010 American Community Survey (ACS) and the U.S. Census Bureau’s 2010 journey-to-work data for the Central Naugatuck Valley Region (CNVR) and its municipalities. The report provides data on the availability of vehicles, the means of transportation to work, travel time to work, and origins and destinations of work trips.March 5, 2014
Unified Planning Work Program (UPWP) FY 2013-14
The UPWP presents transportation planning activities and tasks for the two year period, a schedule for completing the work, the resulting products, and a budget showing amounts and sources of funds.March 5, 2014
TIP Obligated Projects FY2012
This document lists the Transportation Improvement Program (TIP) projects funded in 2012.March 5, 2014
CNVR Transportation Improvement Program (TIP) 2012-2015
The TIP, prepared by COGCNV and CTDOT, is a federally-required four-year funding schedule of highway and transit projects paid for by federal, state, and local funding sources.March 5, 2014