https://nvcogct.gov/wp–content/uploads/2014/03/COGCNV–Regional–Plan–of–Conservation–and–Development–2008_0.pdf
Route 67 Preliminary Engineering Study
Copyright 2016 Milone & MacBroom, Inc. ROUTE 67 (BANK STREET) SPOT IMPROVEMENTS PRELIMINARY ENGINEERING REPORT SEYMOUR, CONNECTICUT State Project No. 124 -165 MMI # 3211–02–4 February 1 9, 2014 (Revised March…
Pedestrian and Bicycle Safety in the CNVR: An Assessment of Existing Conditions
https://nvcogct.gov/wp–content/uploads/2014/03/COGCNV–Pedestrian–Bike–Safety–2010.pdf
Existing Conditions Report
https://nvcogct.gov/wp–content/uploads/2019/05/Final–Existing–Conditions–Report–10–25–18.pdf
Valley/GB Transportation Improvement Program (TIP) 2015–2018
https://nvcogct.gov/wp–content/uploads/2015/09/GBVMPO–2015–TIP–Final.pdf
Valley/GB Transportation Improvement Program (TIP) 2018–2021
https://nvcogct.gov/wp–content/uploads/2018/07/GBVMPO–2018–2021–TIP–2018–06–21.pdf
Regional Plan of Conservation and Development for the Central Connecticut Regional Planning Agency (CCRPA) 2013
https://nvcogct.gov/wp–content/uploads/2017/02/CCRPA–RPOCD–FINAL–2013–23.pdf
Naugatuck River Greenway Routing Study: Overview
Naugatuck River Greenway Routing Study: Thomaston
Central CT MPO Long Range Regional Transportation Plan 2015–2040
Bus Rapid Transit
Bus Rapid Transit Assessment Route 8 & Waterbury Branch Line Corridor Transit -Oriented Development & Alternate Transit Modes Assessment Project April 2019 CDM Smith Planning4Places Harriman Zuvic and Carr BRT […]