Recharge Mapp ing: | 1 COUNCIL OF GOVERNMENTS CENTRAL NAUGATUCK VALLEY RECHARGE MAPPING: A GIS‐ based tool for identifying areas of land with significant groundwater recharge September 2009 Prepared […]
Route 67 Preliminary Engineering Study
Copyright 2016 Milone & MacBroom, Inc. ROUTE 67 (BANK STREET) SPOT IMPROVEMENTS PRELIMINARY ENGINEERING REPORT SEYMOUR, CONNECTICUT State Project No. 124–165 MMI # 3211–02–4 February 1 9, 2014 (Revised March…
Naugatuck River Greenway Routing Study: Overview
NVCOG MTP 2019-2045 Executive Summary
DRAFT Metropolitan Transportation Plan: 2019 ~ 2045 For the Naugatuck Valley Planning Region & Central Naugatuck Valley Metropolitan Planning Area February 2019 Title: Metropolitan Transportation Plan for the Naugatuck Valley…
NVCOG Annual Report 2015 – 2016
COGCNV Economic Development Strategic Plan 2000
Draft ReportMt. Auburn Associates, Inc. i E XECUTIVE S UMMARY The Central Naugatuck Valley region has slowly emerged from the adverse effects of the late 1980’s and early 1990’s recession….
NVCOG Annual Report 2017 – 2018
https://nvcogct.gov/wp–content/uploads/2018/10/4–66r–SFY2018–RSG–NVCOG–Annual–Report–Final–10–01-2018.pdf
I–84/Rt 8 Interchange Study: Deficiencies and Needs Report
Deficiencies and Needs Final Report I–84/Route 8 Waterbury Interchange Needs Study ____________________________________________________________________________________________________________________ June 2010 i TABLE OF CONTENTS TABLE OF CONTENTS……………………………………………………………… ……………………………i LIST OF TABULATIONS……………………………………………………………… …………………………v LIST OF FIGURES……………………………………………………………… …………………………………vi…
Naugatuck River Greenway Routing Study: Beacon Falls
Unified Planning Work Programs (UPWP) for the Greater Bridgeport & Valley MPO FY 2018-2019
Unified Planning Work Program for the Greater Bridgeport & Valley Planning Region: 2018 & 2019 June 15, 2017 Shelto n Ea sto n Fair fi eld M onro e Tru…